Parking study for the Bari BRT

Bari, Italy

Featured image for Parking study for the Bari BRT

The Bus Rapid Transit (BRT) system designed by the City of Bari significantly enhances local public transport, integrating high-frequency lines with existing mobility infrastructure.

MIC-HUB’s parking study assessed the impact of the BRT implementation on on-street and off-street parking in areas adjacent to the project corridors. The aim is to mitigate the temporary reduction in parking, particularly during the construction phase.


The analysis considered population density, urban attractors, pedestrian and vehicular accessibility, and existing parking distribution, distinguishing between regulated and informal spaces. Temporary parking scenarios were evaluated along the main corridors and adjacent areas, identifying interventions on streets and in underused or disused areas to temporarily compensate lost spaces and maintain urban mobility during the transition.


The study integrated official, open-source, and BRT project data, providing an operational framework for short-term parking management ahead of service activation.

Location

Bari, Italy

Client

Parking study for the Bari BRT

Main expertise

Strategic Advisory on Transport & Accessibility; Parking Consultancy

PROJECT HIGHLIGHTS

  • Current on-street parking supply: 23,178 spaces
  • Parking lost due to BRT: 1,950 spaces (-8% of on-street supply)
  • Spaces recovered via temporary parking: 494 on-street, 1,193 in new areas
  • Intervention buffer: 150 m along the BRT corridor, covering 17 project sections

Our contribution

MIC-HUB assisted the City of Bari in establishing temporary parking arrangements, developing design criteria for interventions on streets and in underused or disused areas, optimising urban space usage without compromising mobility.

Analyses assessed the impact of temporary loss of parking spaces along BRT corridors and validated design choices. The team defined guidelines for temporary parking design, including typologies and geometries of parking spaces, as well as pedestrian and cycling routes. Best practices for traffic calming, parking safety and multimodal mobility integration were also defined.

Priority areas for temporary parking were identified near urban attractors and BRT stops, with sustainable and reversible solutions ensuring that spaces can evolve into high-quality urban areas once the BRT is operational.

Let's stay in touch! Subscribe to our newsletter

Join